Groupe ELABOR

Studies & Plans

The research departments of the ELABOR group have a significant experience dealing with scale plans of developments or networks.

By intervening in studies, plans or in checking, the teams of the ELABOR group have contributed to important building sites which are internationally famous: Eurodisneyland amusement parks 1 and 2, Val d’Europe shopping centre, Toyota factory in Honnaing, TGV station of Roissy-Charles de Gaulle airport, Paris-Lyon optical fibre links,…

Ours services

  • Basic pilot study (BPS)
  • Detailed pilot study (DPS)
  • Firm consultation files
  • Assistance to project management
  • Building-site supervision, Set up control
  • Acceptance of work done control
  • Verification plan

Ours Studies Specialities

Substructure studies

Road Plans

Motorways, main roads, secondary roads, crossroads, roundabouts, platforms, built-up area crossings, towns entry…

Urbans developments

Leisure parks, car parks, free setting-up areas, green areas, golf links, residential areas, public parks and leisure zones,…

Various networks

Purification, lighting…

Network studies

Environmental plans

Diagnoses and purification controls
Drainage (agricultural, industrial and urban)

Civil engeneering and cable plans

Telecommunications (optical fibre, video, transport and distribution, long distances,…)
Electric (FEB=French Electricity Board, public lighting, street furniture,…)